Kola Olaniyi MSc. BSc.
6080 Newington Place
Suffolk VA 23435, Virginia, USA.
Cell: +1 757-535-9286 ; Home Num: +1 757-686-6987
Email:kola.olaniyii@yahoo.com
www.linkedin.com/in/OlaOlaniyi
An Experienced Project Scheduler’s
profile
A result-oriented project controls specialist with over
10+ years international experience with a proven track record of successes
working on mega EPC & Capital engineering projects covering -:
construction, utilities (power transmission & distribution, water &
gas; renewable engineering – wind turbines) & highways/civil
engineering projects. An enthusiastic individual with advanced experience in
project management, change and risk management, continuous capital
improvement initiatives, scheduling and planning, including
training & managing other junior schedulers, managing schedules and
projects from inception phase to completion phase and delivering projects to
required specifications/standards, focusing on time, costs, health and
safety, reliability, quality and sustainability; a good team player with
strong organizational and problem solving skills, confident and able to
communicate effectively with work colleagues at all levels; currently
looking for a more permanent position with an engineering company that offers
me more sustainable career progression, learning and training opportunities.
Areas of
Expertise
|
·
Sustainable Construction Methods
|
·
Facilities/Asset Management
|
·
Project & Site Management
|
|
·
Renewable Engineering – Wind Turbine
|
·
Project Planning & Controls
|
·
Quality & Cost Control
|
|
·
Value Engineering/Gate Processes
|
·
Claims Management, SAP
|
·
Pipeline Construction
|
|
·
Highways/Civil Engineering
|
·
Risk / Earned Value Mgt
|
·
Primavera 6.2,8.2,8.3
|
|
·
Design & Build; Contract Mgt
|
·
Project Appraisal/Evaluation
|
·
MS Project/Office Packages
|
|
·
Strong Organization skills/Excel
·
Critical Path Analysis, MS Visio
·
EPC Schedules &
Lifecycle Mgt
·
Production/Resource Planning
|
·
Power Distribution
·
Gantt Charts
·
Water & Gas Distribution
·
Outage/Turnaround Scheduling
|
·
Performance Tracking & Reporting (CPI & SPI)
·
Scheduling/PERT Analysis
·
Wastewater Engineering
·
|
Career History, Professional Experience And Significant Achievements
Systems
Engineering Master
Scheduler/Planner
March 2014 – Till Date
General
Electric
(GE) Power & Water – Renewables Engineering, Greenville, South Carolina
·
Support the Systems
Engineering Program Managers in the design, production and Installation of
Wind Turbines.
·
Collaborate closely
with other schedulers covering Drives & Structures, Blades, Electrical
and Towers Center of Excellence (CoE) teams to develop pre-budget and
baseline schedules and integration of subsystem schedules into master
schedule.
·
Facilitate schedule
development/approval meetings for New Product and Technology Introductions
(NPI & NTI) with Program Managers and Engineering Technical Leads to
ensure projects are accurately scoped and estimated.
·
Work closely with
Loads Check and Validation teams, ensuring the effective capture, monitoring
and tracking of milestones.
·
Develop detailed
schedules and facilitate program meetings (weekly production meetings) to
support resource planning.
·
Verify the ability
to execute the team’s scope of work by analyzing resource capacity and
allocation.
·
Generate weekly task
assignment and resource allocation reports.
·
Support the
scheduling of requisition/design to order (DTOs) projects and the migration
of all NPI/NTI project schedules from Welcome Home/Open Plan scheduling tool
into Primavera P6.
·
Track project budget
and costs through Primavera P6, KRONOS and other GE applicable internal
project management applications.
·
Track engineering
instructions, drawing releases and program milestones through G.E’s Product
Lifecycle Management (PLM) system.
·
Provide status
updates to schedules and analyze progress, schedule performance and variances
from the approved baseline plans.
Primavera
P6 Program Scheduler
Nov 2013- Mar 2014
Louis Berger Group,
Baltimore, MD USA
·
Performed project controls functions including
planning, cost estimating & schedules development, review and status
updating using Primavera P6 8.3 & Primavera Contract Manager
on multiple concurrently running projects including large federal & state
construction contracts ranging from $500k to $27 million USD for Baltimore
City Department of Public Works (DPW) & Department of Transportation
(BDOT) covering road rehabilitation/construction projects; Water
and Wastewater, drainage & stormwater engineering contracts including
Consent Decree Design project portfolio ranging from $1 million -
$27million USD; Backriver Treatment Plant ENR Upgrade – project cost $263M
USD; Loudon Potomac & WSSC Basin Task Orders.
·
Review &
integrate progress schedules from contractors into Master Schedule and
perform analysis including Time Impact Analysis (TIA) on a monthly basis.
·
Assist in the review
of change orders, claims and contractors’ submitted time extensions for
validity.
·
Performed plant
shutdowns/outage/turnaround scheduling in liaison with Project Engineers and
Managers.
·
Perform Quality
Assurance/Control review on contractors’ Critical Path Method (CPM) Schedules
for Baltimore City Department of Transportation (BDOT) road improvement,
construction & rehabilitation projects & District of Columbia Water
& Sewer projects.
·
Provide support for
Senior Project/Program Managers and other stakeholders by providing timely
and concise schedule reports including project status reports showing actuals
vs planned milestones, schedule & cost performance indices.
·
Perform cash flow
forecasting; develop cost & resource loading reports using Primavera P6
and Primavera Contract Manager; also upload and communicate project status
and reports via SharePoint.
·
Ensure constructability
of schedules and compliance with state & federal specifications such as
Maryland State Highway Administration (S.H.A) Standard Specifications for
Construction & Materials – Spec 2008 (Grey Book), Standard Operating
Procedures for Department of Public Works.
·
Review capital
improvements plans (CIP), develop pipeline erosion and sediment
control/stormwater rehabilitation/construction schedules to ensure compliance
with city requirements & design standards.
·
Review projects for
compliance with established City of Baltimore Public Works Design and
Construction standards, and in compliance with stormwater and erosion
sediment control checklists.
·
Track design
milestones and multiple consultants’ schedules for City of Baltimore Consent
Decree Portfolio of Projects.
P6 Program
Planner (Capital
Projects)
June 2012- May 2013
UK Power
Networks, Kent, UK (Portfolio Management of EPC Capital Projects with a
budget range of $2M- $100M)
·
Responsible for
developing and maintaining robust and stable baseline schedules using Primavera
P6 & SAP to enable detailed planning, program management and tracking
progress using Earned Value Analysis.
·
Developed levels 1-4 schedules for program portfolios covering asset
retrofit, production and greenfield capital projects including substation
civil works, oil containment & flood protection, high voltage, Lv, EHv
transformer replacement, overhead lines, switchgear, circuit breakers,
substation telecommunication automation, HVAC, SCADA Control & Automation
schemes.
·
Performed plants
shutdown/outage/turnaround scheduling in liaison with Project Engineers and
Managers.
·
Proficiently
implemented & captured within the schedules gate processes, change
control & prepared Material Requisition (MR) schedule for purchasing Long
Lead Items.
·
Proficiently carried
out design/engineering oversight & coordination capturing both
preliminary & detailed design parameters.
·
Tracked &
prepared schedule performance & dashboard reports for senior program
managers, project managers & relevant stakeholders in accordance with the
project reporting calendar (daily, weekly, quarterly & monthly)
·
Analyzed schedule
risk analyses, evaluate and forecast current status against an established baseline
schedule using Earned Value Management Systems (EVMS).
·
Ensured schedules
incorporate appropriate WBS/CBS/OBS coding structures, milestones,
deliverables and activities aligned to the project scope, and that critical
path(s) are clearly identified.
·
Coordinated and led
project progress review & status update meetings with project managers
and senior program managers.
·
Ensured interfacing
(internal/external) projects' relevant milestones, constraints and activities
are incorporated into the project schedule.
·
Validated
construction methodologies, scope definition & control, resource and cost
loading of schedules, verify activity durations, schedule logic, float
allocation and critical path identification within Contractors’ schedules
submissions in support of UK Power Networks contract program policies.
·
Proactively carried
out monthly reporting covering milestones data reporting, dashboard
reporting, Load Indices/Health indices, ensuring that reports meet deadlines.
·
Supported junior
schedulers, project managers & cost managers in the preparation of
Invitations to tender (ITT) packages.
·
Worked with Risk
Managers and project delivery teams to identify and incorporate risk
mitigating action plans.
·
Carried out rigid
cost control, commercial management and strategic sourcing practices that
deliver ‘value for money’.
·
Achieved compliance
with UK Power Networks project delivery and program governance procedures.
·
Accurately
identifying, controlling and forecasting the time scales and resource
requirements of projects to minimize the likelihood of time and cost
overruns.
·
Oversee the
programs, monitoring and reporting on project performance, highlighting
deviations, providing early warnings, identifying and presenting project
slippage recovery strategies.
·
Worked closely with
Project Managers, Design Engineers, Manufacturers, and Estimators to identify
potential changes in scope and quantify the impact of each change to the
schedule in a timely fashion.
·
UKPN Olympic 2012 Project Delivery Team Award
– Dec 2012
Reactive Maintenance
Planner/Coordinator May 2011 – Jan 2012
Morrison
Facilities Services/Mears Group, London, U.K
·
Planned repairs
works for pre and post inspection, reactive voids and emergency repairs.
·
Managed over 30
engineers’ diaries and prioritized emergency works using OPTI TIME Planner
and personal digital assistants.
·
Booked appointments
and allocated works to available engineer(s) and following repairs works from
start through completion.
·
Raised repairs jobs,
liaised with tenants and engineers in order to ensure works were completed
within designated timescale.
·
Carried out detailed
resource planning & allocation including supplier oversight and
coordination.
·
Effectively
communicated any concerns about work quality and ensured engineers have the
right materials to complete assigned tasks.
·
Effectively liaised
with all stakeholders including clients and housing tenants.
·
Ensured that all
relevant data is updated and dispatched on a timely basis to all affected
resource PDAs.
Project
planner
Aug 2010 – May 2011
Ringway Jacobs (a subsidiary company of Jacobs
Engineering Group), London, U.K
Highways &Civil
Infrastructure Management Portfolio - This contract covered the construction & repair of
highways & civil infrastructures refurbishment including traffic lights,
drainage systems, pedestrian guardrails, bridges and tunnels across London,
UK with a Contract Budget of $30M USD per year.
·
Managed all
planning, scheduling, cost loading of schedules and claims for the projects
using P6 and MS Project.
·
Carried out detailed
resource planning & allocation including Design/Engineering oversight and
coordination.
·
Imported
contractors’ schedules into the master schedule and make necessary logic
ties.
·
Reviewed
contractors’ schedules for adherence to project specifications and updates
for compliance to initial plan.
·
Supported the
development of process flows, policies, procedures training materials, and
scheduling best practices.
Project
Scheduler
Mar 2010 – July
2010
Balfour Beatty Utility Solutions, Lincoln, UK –
(Water & Gas Assets Management Contract - Budget $50M USD)
·
Carried out Project
Control & Planning duties including planning, scheduling and monitoring
workloads for 20 project teams.
·
Developed and
managed Network Asset Management Plans (NAMP), using MS Projects 2007
including the scheduling of work within agreed priorities, resource
availability and targets.
·
Monitor critical
path(s) of the schedules to identify risk and opportunities and develop
mitigation or recovery plans.
·
Ensure all risk and
construction methodology assessments in line with Health and Safety
regulations are carried out prior to allocating jobs to project teams.
·
Carried out Resource
loading, resolve resource overloading conflicts.
Construction Project
Manager
May 2004 – Aug 2008
Reyog Construction International Nigeria – Capital
Projects ranging from $1M - $150M USD
·
Managed all
construction, building and other activities related to establishment of
buildings and infrastructures.
·
Managed project
lifecycles from inception phase to post construction including project
controls - planning and scheduling.
·
Managed several sub-contracts,
commercials, H & S of various packages of work including new builds,
design and build, retrofit/refurbishment, civil and highways construction
projects.
·
Carried out project
scope definition and control, reinforced concrete design and structural
calculations of beams & columns stress analysis; foundation design, roof
design.
·
Tracked Project
performance & progress by comparing actual work carried out against
established baseline data.
·
Managed both direct
and contract staff, design consultants, cost estimators, suppliers.
Academic qualifications & Awards
|
University of Lincoln,
United Kingdom (U.K)
|
Master of Science, Construction Project Management
|
Dec 2009
|
|
Obafemi Awolowo University, Nigeria
|
Bachelor of Science, Building Engineering &
Management
|
Nov 2006
|
|
Other Personal details
Ø Member – Project Management Institute (PMI) {PMP
Certification – In View}
Ø U.S Green Card Status (US Citizenship Status in View)
Ø NIGERIAN YOUTH SERVICE CORPS (N.Y.S.C) CERTIFICATE,
2007
Ø Member – Oracle Primavera Special Interest Group
(OPSIG) - http://primaverasig.com
|
|
|
|
Every purpose (project) is established by good counsel…and through
wisdom is a house built…